|
Area |
Status |
Topic |
|
| Search: | |||
[Translate to English:] Mit der Erstellung des 2d Modells werden primär zwei Ziele verfolgt, zum einem auf dem Gebiet der Wasserwirtschaftlichen Planungen den Stand der Technik zu entsprechen mit einem hydrodynamischen numerischen 2d-Modell für die gesamte österreichische March – Thaya Strecke. Und zum anderen eine bilaterale Planungsgrundlage auf demselben Stand zu haben, das gemeinsam entwickelt und gemeinsam genutzt wird und auf dessen Grundlage gemeinsame Planungen durchgeführt werden können. [more]
[Translate to English:] Dipl.-Ing. Christoph Fehringer
Tel: +43 (0) 504321 2600
christoph.fehringer via-donau.org
Preservation of the fairway channel and the stipulated minimum fairway depth in the Danube [more]
Ing. Andreas Peck
Tel.: +43 (0) 50 4321 5003
andreas.peck via-donau.org
Replacement of 8 bollard foundations, installation of 8 stairs, application of a new asphalt coating on the tow paths [more]
Ing. Andreas Peck
Tel.: +43 (0) 50 4321 5003
andreas.peck via-donau.org
The goal of the project is the elaboration of a study on the development of port facilities for the private port operator Metaltrade International in Galati (port basins of Docuri, Bazinul Nou and Siret). Based on a status quo observation, the development study will draw up, along with proposals for land surface division, preliminary designs for quays, buildings and handling equipment. This study will provide the basic tools for Metaltrade International to further develop the port Galati. In addition to the management of the project via donau will have a consultative role for the areas pertaining to inland navigation and logistics. [more]
Mr. Gerhard Gussmagg
Tel: +43 (0) 50 4321 1617
gerhard.gussmagg via-donau.org
The goal of the project is to evaluate the need for a new inland waterway transhipment site in Aschach an der Donau in the framework of a pre-feasibility study. via donau and the Chamber of Commerce of Eferding started this co-operative project in view of the rising interest that the local manufacturing companies have been showing for this site. The study includes an analysis of the customer portfolio, the technical configuration, and the investment costs to be taken in consideration as well as the organisational structure. Through a cost-efficient transhipment possibility that the site Aschach an der Donau could offer, the cargo which is currently solely being transported on the road could be shifted to inland vessels on the waterway. [more]
Mr. Gerhard Gussmagg
Tel: +43 (0) 50 4321 1617
gerhard.gussmagg via-donau.org
The eFreight approach contains all transport and logistics processes, commencing with the planning of the transportation itself and ending with the actual accomplishment. It is essential to link all modes of transport and their electronic systems and applications to build multimodal transport networks. The project will provide an eFreight platform supporting the design, development, deployment and maintenance of eFreight Solutions which will be validated in business cases. [more]
Mag. Dr. Gerhard Schilk
Tel: +43 (0) 504 321 1621
gerhard.schilk via-donau.org
Advanced Impacts evaluation Methodology for innovative freight transport Solutions (AIMS):
AIMS applies an innovative approach to develop a methodology to assess and evaluate research projects related to freight transport supported in FP5 and FP6. AIMS aims to minimize the risks of public or private investments in freight transport RTD. AIMS will identify critical factors of RTD projects through success and failure analysis of previous FP5 and FP6 projects. Based on results coming from the analysis of the past, present and future (notably as seen by Technological Platforms and Advisory councils), AIMS will assess the positive or negative impacts of European research FP and projects in particular in the economic, social and environmental fields.
[more]
Mag. Dr. Gerhard Schilk
Tel: +43 (0) 504 321 1621
gerhard.schilk via-donau.org
The project aimed at developing in Austria an EU compliant and with the further states of the “upper Danube” (Germany, Slovakia, and Hungary) regionally agreed collection and treatment system of ship waste. [more]
Dipl.-Kff. Petra Seiwerth
Tel: +43 (0) 504 321 1606
petra.seiwerth via-donau.org
This project captured transport volumes of agricultural, raw and semi-finished products from crop cultivation and described possibilities for a transfer to inland waterway transport by taking account of the required service qualities. In the context of the project, Agrana Zucker GmbH examined the possibility of transporting sugar beet by inland navigation vessel from Enns to Tulln and conducted a pilot test. [more]
Mag. Gerhard Gussmagg
Tel: +43 (0) 504 321 1617
gerhard.gussmagg via-donau.org
Also Danube aimed to prove that the concept of a common source logistic database (CSL.DB) was a key element to provide multimodal door-to-door transport services with inland navigation as the main haul. [more]
DI (FH) Mario Sattler
Tel: +43 (0) 504 321 1613
mario.sattler via-donau.org
Tasks, objectives and projects of Austria's waterway management and development company
Information on transports plus facts and figures for the Danube waterway
Services and information for inland waterway transport operators on the Danube
Integrated River Engineering Project on the Danube to the East of Vienna
Realisierung eines nachhaltigen Hochwasserschutzes an der March.
Danube Ports Online
via donau blue pages online