This Pre-Feasibility Study is intended to serve as the basis for the development of a new cargo port in Belgrade. The existing port in the city centre has reached his limits in terms of transport connection and room for expansion. The construction of a new international port in Belgrade has been envisaged in the city’s development plans and should be completed by 2021. The contracting authority is „Belgrade Land Development Public Agency“. via donau is contributing to several work packages of the study, e.g. assessment of transport potentials especially in container business. [more]
Mag. Gerhard Gussmagg
Tel: +43 (0) 504 321 1617
gerhard.gussmagg via-donau.org
The principal project goals are: To develop a strategy based on a plan of action adjusted to the required uses of the river and to enable the management of revitalization measures on a bilateral basis – taking the relevant EU directives into account and with the participation of the public. The plan of action is to serve as a joint planning document for the revitalization and water engineering measures. [more]
Johann Wösendorfer
Tel: +43 (0) 504321 2607
johann.woesendorfer via-donau.org
The overall project consists of the elaboration of studies regarding the development of railway corridor Vc and intermodal transport in Bosnia and Herzegovina. The contracting authority is the delegation of the European Commission in Sarajevo. Within the intermodal part, via donau will analyse the potentials for river navigation transport and ports along the Sava-river. Thereby supply and demand side will be assessed and recommendations will be derived. [more]
Mag. Gerhard Gussmagg
Tel: +43 (0) 504 321 1617
gerhard.gussmagg via-donau.org
The “Integrated River Engineering Project on the Danube to the East of Vienna” is a comprehensive project that integrates several aspects
Christian Schramm
+43 (0) 504321 2610
christian.schramm via-donau.org
Implementation and Harmonisation Study for the deployment of the EU Directive on River Information Services (2005/44/EC). This study contributes to the stimulation of harmonized investments in infrastructure for River Information Services on the basis of the EU RIS Directive in order to improve safety, efficiency and environmental friendliness on European inland waterways. [more]
DI Andreas Bäck
Tel.: +43 (0) 50 4321 - 1609
andreas.baeck via-donau.org
Synonyme: "Uferrückbau Thurnhaufen", "Uferrückbau gegenüber Hainburg" Removal of existing stone protecting structures (embankment protection and old water regulating structures) in the area of Thurnhaufen (across from Hainburg), which is expected to result partly in a flattening due to natural erosion of the embankment and in the formation of a natural steep embankment. [more]
Reinhard Schlögl
Tel: +43 (0) 504321 5100
reinhard.schloegl via-donau.org
Creation of gravel structures such as flat embankments or islands in the main river between Melk and Krems and the linkage of old tributaries in the area of river meadows in the Wachau [more]
Bernhard Karl
Tel: +43 (0) 504321 3008
bernhard.karl via-donau.org
The content of the project is the restoration and erection of new protection structures against flooding along the Morava River for HW100 (100-year high water) including the safety heights accorded with the Slovak Republic in the Boundary Water Commission (70 cm) in the area of Angern-Mannersdorf-Stillfried and Waidendorf-Dürnkrut-Jedenspeigen. In the preparatory phase, it was necessary to conduct an Environmental Impact Assessment. [more]
Christoph Fehringer Tel: +43 (0) 504321 2600 christoph.fehringer@via-donau.org
Demonstrate and validate Tracking and Tracing (T&T) technologies and services using EGNOS/Galileo with the goal of developing pre-operational systems, providing “end-to-end low-cost services” for regulated applications. [more]
DI Christoph Amlacher
Tel: +43 (0) 50 4321 - 1608
christoph.amlacher@via-donau.org
Renaturalization project on the Morava River within the scope of bilateral planning and implementation process for the improvement of the status of the water ecology of the Natura 2000 area March-Thaya-Auen. The project comprises preliminary studies, planning, official proceedings, execution of construction and a three-year phase of comprehensive monitoring. [more]
Johann Wösendorfer
Tel: +43 (0) 504321 2607
johann.woesendorfer via-donau.org
Informations and details about the danube navy-, transport and logistics sector in Austria.
All about transports on the danube as well as facts and figures of the waterway
Services and information for all shipping companies on the danube
Integrated River Engineering Project on the Danube to the East of Vienna
Danube Ports Online