This Pre-Feasibility Study is intended to serve as the basis for the development of a new cargo port in Belgrade. The existing port in the city centre has reached his limits in terms of transport connection and room for expansion. The construction of a new international port in Belgrade has been envisaged in the city’s development plans and should be completed by 2021.
Tina Vienna (Vienna) and Ehting (Belgrade)
A - Pre-Feasibility Study (Determining the technical, economic, spatial, social and financial feasibility of the designed port)
B – Conceptual Design (of the new port)
via donau is contributing to several work packages of the study, e.g. assessment of transport potentials especially in container business.
Mag. Gerhard Gussmagg
Tel: +43 (0) 504 321 1617
gerhard.gussmagg via-donau.org
to listing
Informations and details about the danube navy-, transport and logistics sector in Austria.
All about transports on the danube as well as facts and figures of the waterway
Services and information for all shipping companies on the danube
Integrated River Engineering Project on the Danube to the East of Vienna
Danube Ports Online