Inhalt Hauptmenü Aktueller Pfad Bereichs Menü Submenü Kopfmenü Fusszeilen Menü
project area


The free flowing section of the Danube between Vienna (Freudenau power plant) and the Austrian-Slovakian border (river km 1921.00 – 1872.70) still has the character of a mountain river (high flow rates, frequently fluctuating water levels etc.).

It is characterised by an ongoing erosion of the riverbed at an average rate of 2.0 to 3.5 cm per year. This riverbed erosion seriously affects the ecological balance of the Danube Floodplain National Park.

In addition, inadequate and seasonally strongly fluctuating fairway depths in this section of the river substantially curtail the reliability and competitiveness of navigation over the course of the year.

For this reason, the Federal Ministry for Transport, Innovation and Technology and via donau – Österreichische Wasserstraßen-Gesellschaft mbH have launched the “Integrated River Engineering Project on the Danube to the East of Vienna” to eliminate the ecological deficits and improve the fairway conditions in this section of the Danube.

Further information on the Integrated River Engineering Project and its pilot projects is provided on the project’s website “Integrated River Engineering Project on the to the East of Vienna”.

DI Dieter Pejrimovsky

CONTACT

DI Dieter Pejrimovsky
FGP

EU Logo
 
Bereiche von via-donau
via donau

Tasks, objectives and projects of Austria's waterway management and development company

Navigation

Information on transports plus facts and figures for the Danube waterway

DoRIS

Services and information for inland waterway transport operators on the Danube

FGP

Integrated River Engineering Project on the Danube to the East of Vienna

March

Realisierung eines nachhaltigen Hochwasserschutzes an der March.

Ports

Danube Ports Online

Blue Pages

via donau blue pages online